The Chedi Andermatt Hotel driveway all glass

The Chedi Andermatt project was a major challenge. Hardly ever before has a supporting structure made of glass been built at such a great height. The snow loads acting on the structure are enormous.

The connections to be released from the glass elements had to be developed and tested specifically for each project.

Hotel driveway glass statics, execution planning

Facts & Figures

Statics

  • Dimensioning the glass construction
  • Testing connections

Construction

  • Detailed design of the glass structure

Quality assurance

  • Testing the glass components in the factory
  • Testing the construction on site
Hotel driveway glass statics, execution planning
Glass construction
Glass construction

Further projects

We are engineers with in-depth knowledge in the fields of glass, façade, steel and metal construction. Our basic training is in craftsmanship, which allows us to think practically.

Roffler team picture

get to know us

We are engineers with in-depth knowledge in the fields of glass, façade, steel and metal construction. Our basic training is in craftsmanship, which allows us to think practically. 

Thanks to our further training in engineering, business management, welding technology and energy, we are able to optimize our solutions. We are constantly training ourselves and are familiar with the latest standards, laws and developments.